Quality controls

Before, at the beginning and during production.

The control most requested by buyers in Asia is preshipment or loading of the container. Thanks to our prices, you can contract various controls from before starting until the time of loading.

Material control

You will ensure that the materials have the quality your product needs, and also that the materials arrive at the factory in time. You will be informed that everything is in order or if there is any delay in the steps programmed with the factory.

Start of production

We check that the agreed steps are carried out on the agreed date and that the qualities and characteristics agreed with the factory are respected. In this way, the waste of material and arguments with the manufacturers are avoided, as it is very difficult to find a manufacturer in china that accepts his error and compensates it. Our goal is to avoid problems and ensure everything runs smoothly. It is not a case of finding guilty parties, but of being successful.

Production control

Production control is essential. The first is performed when 20% of production is completed to correct any error and avoid more serious setbacks in the future. In this way, we ensure that everything is in order and that what has been agreed with the client is being fulfilled.

Pre-shipment control

Control we perform when the goods are practically finished and being packaged. In this way, we can know the status of our purchase, whether it complies with the agreed characteristics and qualities, whether the number of boxes and units per box is correct, and whether the marks of the shipment are appropriate, among other things.

Loading control

We check that the goods have been properly packaged, that the number of packages is correct, and also that the container is loaded with due care, in order to ensure the goods do not reach their destination in bad condition making it necessary to claim from our insurance. We also check that the container is properly sealed.